Bergey Wind Power

[publisher thread2]


To avail of the tariff structures, you need to connect your wind turbine to the grid. Depending on where you are located and who your energy supplier is, different criteria will apply. In all cases, you will need to apply to your energy supplier for permission to connect to the grid.

In the UK, the criteria will be determined by the type and size of your micro-generator. For more information on connecting to the grid in the UK see the following web site address:
http://www.bwea.com/ref/generating.html

In the Republic of Ireland, again, the type and size of your micro generator will determine the criteria for connection. Under the ESB Support Initiative for Micro-generation, on a single phase connection, the ESB will allow a 6kW system and on a three phase connection, an 11kW system is permitted. To apply, customers need to complete an NC6 form and return it to ESB Networks.

To connect larger systems on single or three phase connections, customers need to complete the more detailed NC5 form and return it to ESB Networks. Additional conditions apply to this type of connection.

For more information on connecting a micro-generator to the grid in the Republic of Ireland, please see the following web site address:
http://www.esb.ie/esbnetworks/generator_connections/micro_gen_connections.jsp


Back to top


Powered by Strata3