| Aughinish Alumina CHP |
 |
| Client: |
SNC Lavalin Constructors
|
| Engineer: |
NEL Power Ltd
|
| Architect: |
N/A |
| Value: |
N/A |
| Period: |
May 2004 - December 2004
|
Description:
Site preparation and main civils work for the Combined Heat & Power Plant at
the Aughinish Alumina refinery plant at Askeaton, Co Limerick, Ireland.
The CHP development is located on the existing refinery site. SIAC
Construction Ltd were contracted to prepare the site and undertake the main
civils works.This work included;
-
Groundworks including drainage and ducting
-
Building and equipment foundations
-
Floor slabs
-
Firewater main
-
Building works
-
Ducting
-
Site finishes
-
Surfacing works. The principal quantities included 340 te of reinforcement and
4,900 m3 of concrete.
|
|
|