Hibernian Molasses Storage Depot
Client: Hibernian Molasses
Engineer: Fahy Fitzpatrick Consulting Engineers
Architect: N/A
Value: c. €19 M
Period: October 2004 - June 2006

Description:

  • Excavation and disposal of 15,000m3 of contaminated/hazardous material, and replace with clean-fill material
  • On site recycling and treatment of reusable material
  • Supply and install 10,000 linear metres of pre-cast piles
  • Supply and place approximately 2500m3 of reinforced concrete in tank bases, bund walls and pump room
  • Supply, fabrication and erection of nine steel storage tanks
  • Installation of two pipelines
  • Construction of office building, boiler room and blending room building, a compressor room and workshop building
  • Construction of an ESB substation and switchroom building
  • Construction of a loading gantry building and weighbridge
  • Construction of site roads and fencing and installation of all drainage and services