| Hibernian Molasses Storage Depot |
 |
| Client: |
Hibernian Molasses
|
| Engineer: |
Fahy Fitzpatrick Consulting Engineers
|
| Architect: |
N/A |
| Value: |
c. €19 M |
| Period: |
October 2004 - June 2006 |
Description:
-
Excavation and disposal of 15,000m3 of contaminated/hazardous material, and
replace with clean-fill material
-
On site recycling and treatment of reusable material
-
Supply and install 10,000 linear metres of pre-cast piles
-
Supply and place approximately 2500m3 of reinforced concrete in tank bases,
bund walls and pump room
-
Supply, fabrication and erection of nine steel storage tanks
-
Installation of two pipelines
-
Construction of office building, boiler room and blending room building, a
compressor room and workshop building
-
Construction of an ESB substation and switchroom building
-
Construction of a loading gantry building and weighbridge
-
Construction of site roads and fencing and installation of all drainage and
services
|
|
|