Description:
Construction of wastewater treatment works of 3,150pe, including;
-
Construction of three pumping stations and control buildings
-
New sewers to replace and extend the existing systems
-
Surface water pipelines
-
Water mains (part of advanced works for Ballina RWS)
-
Repairs and rehabilitation to existing system
-
Demolition of existing treatment works
-
Refurbishment of three existing pumping stations
-
Renewal of town centre streetworks
Special operations included:
-
Traffic management in urban environment
-
Permanent and temporary works in River Deal
-
Use of structural sheet piled cofferdam
-
Construction of pre-cast, post-tensioned tanks
|