Description:
This project involved the design and construction of the civil engineering
works associated with the construction of a sewerage treatment scheme designed
to deal with flows of up to 70,000pe.
The works involved the construction of the following:
-
Large concrete tanks
-
Administration building
-
Process building
-
900mm diameter sea outfall pipeline which extends out 2km under the bed of the
Irish Sea
-
7km of 350mm diameter and 600mm diameter ductile iron rising mains
-
Concrete gravity pipelines
-
Three sewerage pumping stations
-
Interconnecting process pipework
-
Siteworks
-
Landscaping
|