Balbriggan - Skerries Sea Outfall
Client: Fingal Co. Council
Engineer: J.B. Barry and Partners
Architect:
Value: c. €5.5 M
Period: 2004 - 2005

Description:

The project involved the construction of the civil engineering works associated with the outfall pipeline from the sewerage treatment plant. Trench excavation required for drilling and blasting of 250m part of the trench.

The works involved the construction of the following:

  • 900 mm diameter sea outfall pipeline which extends out 2km under the bed of the Irish Sea
  • Diffuser placed by divers operating from barge and placement of scour protection using concrete
  • All pipeline fabrication and jointing works were completed 10 miles from site. Pipeline had to be towed to site. Trench siltation meant that all pipe strings had to be joined in trench at trench base level