Elan Pharmaceutical Manufacturing Plant
Client: Elan
Engineer: Project Management Ltd
Architect: Project Management Ltd
Value: Private
Period: 2004

Description:

The Multi Million Euro Élan Fill Finish Project was constructed as an extension to the existing pharmaceutical manufacturing plant in Athlone during 2004.

SIAC was responsible for:

• Steel fabrication and erection including all pipe rack steelwork.

• FM specification compliant built up roofing system.

• Rainwater disposal system.

• Kingspan composite cladding panel systems.

• Levolux Louvre system.

• Kawneer Double Glazed Curtain Walling.

• Roller shutter doors and dock levellers.

• Steel external doors.

• Fully air sealed and tested external envelope.