Description:
Working with Bovis Lend Lease SIAC designed and installed the building
envelope which incorporated a large front elevation of bomb blast curtain
wall.
The work involved the refurbishment of the existing terminal and included
demolition and new build whilst keeping the airport fully operational.
|