A1/N1 Newry Dundalk Link Road
Client: Department for Regional Development (&) Louth County Council
Engineer:
Architect:
Value: c. € 90M
Period: June 2005 to December 2007 (anticipated)

Description:

Works Include:
1. Construction of 15km of Standard Dual Carriageway
2. Construction of approx. 7km of Side Roads
3. Construction of 11 No. road bridge structures including one crossing of main Belfast to Dublin railway line
4. Construction of a pedestrian overbridge and an underbridge
5. 600,000m3 of Rock Excavation
6. Installation of 25,000 lnm precast concrete piles to support embankment
7. Manufacture and laying of CBM for pavement construction
8. Construction of works adjacent to existing A1/N1 Primary National route to include 6 no. roundabout tie-ins
9. Associated accommodation works, fencing, drainage & utilities
10. Works included bridge over Dublin to Belfast Railway Line. Bridge value