Description:
Tonnage: 4,500Te
The Hangar measured 160m long x 100m deep. Apart from one internal column it
was clear spanning. The door support girders and the central spine girder (4
no) were each 80 meter long two of which were 11 meter deep and weighted 180Te
each.
The door and spine girders were assembled on site and lifted into position
using a tandem crane lift.
The structure is 22m high to the underside of the girders i.e. 32m to the top
of the girder.
|