| Pier C, Dublin Airport |
 |
| Client: |
Aer Rianta |
| Engineer: |
KML |
| Architect: |
|
| Value: |
|
| Period: |
|
Description:
Tonnage: 2,000Te.
This project involved working “airside” and in a “live” and working airport
terminal under very stringent access and safety restrictions. Furthermore the
project contained 2No large link bridge trusses which measured 32.0m long x
7.30m high. These trusses were fully welded in our workshop and delivered in
one piece to site. The above trusses were transported on specially made
trailer frames to negotiate the M50 toll plaza within a tolerance of inches.
|
|
|