|
|
| Sean Heuston Bridge Refurbishment |
 |
| Client: |
Railway Procurement Agency |
| Engineer: |
Railway Procurement Agency |
| Architect: |
N/A |
| Value: |
c. €4M |
| Period: |
May 2001 - March 2002 |
Description:
The scope of the contract included;
-
Cleaning and refurbishment of the cast iron bridge and granite features
-
Temporary support of the entire structure from rock bearings piles anchored in
the River Liffey bedrock
-
Removal of old and the placing of four new girders
-
Construction of the new deck with LRT pedestal tracks with associated stray
current connection mats
-
Temporary division of ESB cables away from the structure and replacement in
the re-constructed bridge deck
|
|
|