|
|
| M4 / M6 Kilcock to Kinnegad PPP motorway |
 |
| Client: |
NRA via EuroLink |
| Engineer: |
Westconsult (RPS, Roughan and O'Donovan) |
| Architect: |
N/A |
| Value: |
c. €275M |
| Period: |
March 2003 - December 2006 |
Description:
-
First Public Private partnership road contract signed by the NRA.
-
Design and construction of 36km of motorway, 3km of dual carriageway and
associated side roads.
-
Design and construction of 18 overbridges, 2 underbridges and grade separated
junctions at Kilcock, Enfield and Kinnegad.
-
Works included the design and construction of a main toll plaza with 9 lanes
in each direction and 2 subsidiary toll plazas.
-
Undertaken in a rural, environmental sensitive setting.
-
The successful planning and procurement of 1 million m3 of road fill from
adjacent landowners which reduced the disturbance and inconvenience to the
local community.
-
The successful relocation of over 50 badger setts and 86 bat roosts.
-
Completed 10 months ahead of schedule
|
|
|