Dublin Airport T2 Enabling Works
Client: Dublin Airport Authority
Engineer: Arup's
Architect:
Value: Private
Period: 2007

Description:

The projects involves the diversion of Utility Services within a main services trench routed to co-ordinate with the future Terminal 2 arrivals roadway. The diversion of the following Utility Services:

  • ESB 38kV and 10kV cabling and ducting
  • Bord Gais gas main pipework
  • Eircom fibre and copper cabling
  • All DAA 10kV and 400V cabling


The project also involves the site clearance of below ground services and above ground associated street furniture and shrubbery within the footprint of Terminal 2 and associated road ways construction area.

The demolition of several buildings including the controlled demolition of Corbalis House.

Tanks moved/replaced.